Frame time......
I was debating which way to go with the front section of the frame where the header section enters the barrel.
I wanted to use a ring/pipe type section to fill the gap.It got a little tight with the way the pipe snakes out and the ring would have been a little weak (maybe) and since i didn't have any pipe that size i decided to go with an outer loop/semi PE looking bash guard.
The pipe is the left over old frame section from the air box-backbone.
I put hacksaw cuts along it and bent it around to suit and welded it up again.
I had some stainless plate laying around (3 or 4mm)and cut sections out to brace it up.
Its not the prettiest design but a lick of paint always makes things look better
Most of the hard stuff is nearly done and a re-assemble in the next day or two to make sure everything fits in. A general clean up of the plastics,new fork seals to buy,engine clean up etc etc.
I managed to find a TM34 carb from tassie and then located another in the US for $50 delivered.
Still sorting out the rear shock as i reckon the one i have is off something else(bike sits lower than it should) and Bahnsy kindly donated some left over '84 shock bits to see what i can come up with...although i have a spotted an '85 shock(needs rebuild) in the US which will fix my problem.
Thats all i have for ya's....cheers mario