Back again!
After a busy week of work,vet visits,b/day parties...it was time to get back into the bike.
New fork seals were fitted and 10w oil put in and the forks re-assembled.
The new fork boots were also fitted to bling it up a little.Tyre and tube from the trusty PE175 (poor thing must feel like a prisoner that keeps dropping his soap in the shower)....not that i know what its like
A set of Barkbusters arrived and were also fitted,i had to extend the right side bracket a little to clear the master cylinder fitting.I was worried if the bike was dropped,the clamp would snap the end of the m/cylinder fitting.
Next on the list was the left side shroud and what to put in the empty space
I had this stainless steel flexi cat/converter holder sitting around that fitted in the space available.
I also had my trusty Anaconda aluminium 1lt drink bottle that sat in the holder nicely
Welded up a couple of brackets to the rubber dampened fittings on the RM frame and brackets to the holder for the shroud to bolt up to.
All fitted up,the shroud sits in place nicely.If i use a long screwdriver to unclip the locks,the whole shroud swings open.
The real test will be out in the bush to find out how sturdy everthing is.If it all falls apart and is a pain in the butt,I'll end up fitting the PE tank and seat combo to give the extra fuel and less hassles.
Still have the little odds and ends to finish it off,but its almost there!
till next time