Pulled my finger out and have fabricated an alloy box which allowed me to move forward again ....
All mounting brackets are in place . airbox x 4, rear guard x 4, exhaust @ end of seat rail LHS X 1 plus one on rear engine mount cross bar,
side covers x 4, chain rollers upper and lower, seat @ rear of rails , tank rear mount and also front mounts
CDI @ front of steering stem. and a steering stop below lower bearing.
Currently grafting a Pe 250 swing in place as I'm wanting to run a cush drive rear hub Dr 400 as it's not so hard on the gear box .
Tank is almost complete as I had to reshape the tunnel again
due to changing steering rake to 30 degrees
Will show a mock up in coming weeks when tank is complete ...... stay tuned