hhhmmmmm,Plan A ,bare frame,1/2 rubbed down on work bench,swingarm is primered,3 sets of forks to choose from , steering stems are polished , back wheels done,not sure of front yet,(deferr to fork selection?),original tank needs sealing,the rebuilt motor is in the other (wrong ) frame!!,(plan B ),will attempt to start tommorrow,check gears are all there etc,if alls good,plan A 's back on priority status,hey i got nearly a week before Nats, ,don't think the lawns gunna get done
well plan A got canned bigtime!!,slight hiccup with glass repair,so i'm quitting,going to bed (now remember why i modified centre skirt,bloody seats tool box fouls it, :'(),so,just a muffler required on my experimental down pipe(off bandito road racer??),think a quick blast up the road later today before i load it in van,(paddocks a tad wet,it's been pissin down),typical,hope it's not rrrr ai ni nng you know where this weekend