Thanks everyone
OROUK {Wales} supplied the rod kit, later models fit with a bit of machining of the pin.
www.cmsnl.com had a rare bearing, and he's had to make some gaskets.
The engine work [including a YZ400] was supposed to take the winter and got telescoped into two weeks!
Had to be ready for Cwmyoy [koomyoy as in joy]